The System Logistics project management team visited an automated high-bay warehouse at Adelholzener Alpenquellen in Siegsdorf. The warehouse is 42 metres high, provides 23,000 pallet storage locations and was implemented while production remained operational. The system connects eight existing production facilities at the beverage manufacturer.
The visit was part of a team outing organised by the project management department. The programme included a tour of the production facility and a review of the projects System Logistics has implemented for Adelholzener over the past few years.
An Overview of the Facility
| Location | Siegsdorf |
| Industry | Beverages |
| Warehouse type | High-bay warehouse (silo-type), double-deep storage |
| Height | 42 metres |
| Storage locations | 23,000 |
| Throughput | Approximately 300 pallets per hour |
| Additional storage | Manual block storage area |
| Transport system | Roof-mounted electric monorail system (EMS) |
| Production line connection | Eight existing production facilities connected via conveyor lifts |
| Shipping | Side and rear loading |
| Control system | System Logistics Warehouse Control System (WCS) with block storage management as well as dock and yard integration |
What the project team saw
Concept development, planning and commissioning take place both at the desk and on site. However, the system’s day-to-day performance becomes apparent at the production facility. The visit gave the team the opportunity to see the warehouse in operation and discuss its performance with colleagues from Adelholzener.
Built during ongoing operations
Adelholzener aimed to increase storage capacity and throughput without requiring additional floor space or interrupting production. The electric monorail system runs along the warehouse roof. The existing production lines are connected via overhead conveyor lifts. The shipping area is also supplied by the electric monorail system. All operations are centrally controlled by the System Logistics WCS.
The project was implemented without significant interruptions to production. For operators who need to build or expand a warehouse while production continues, this is the most important aspect of this reference project.
The expansion
The warehouse increases storage capacity without requiring additional floor space. The 42-metre-high facility features six double-deep storage aisles and provides 23,000 pallet storage locations.
Partnership Across Multiple Projects
System Logistics has been working with Adelholzener for several years. We would like to thank the team in Siegsdorf for the guided tour of the facility and the open exchange of ideas.