It is the first question every decision-maker asks – and the most honest answer is: it depends. Standard prices can be misleading because the investment depends heavily on your specific requirements. What we provide at an early stage is a reliable budget price, including an ROI analysis, that you can use for your internal calculations.
Key figures at a glance:
Why There Is No Standard Price
Every high-bay warehouse is individually designed. Whether it has 3,000 or 40,000 pallet locations, a height of 12 or 42 metres, ambient or deep-freeze conditions, moderate or high throughput – each of these factors has a significant impact on the investment. A reliable price can only be determined once these key parameters have been established. Anything else would be guesswork.
Was die Kosten bestimmt
- Number of storage locations and height: determine the rack design and steel structure.
- Construction type: silo or in-house—with a significant impact on construction and permitting.
- Temperature zone: Deep-freeze storage requires insulation and frost-resistant technology.
- Throughput: determines the number and capacity of the storage and retrieval machines and the type of transport technologies.
- Level of automation and IT: conveyor systems, interfaces, software (WMS/SAP EWM).
Investment Is Not the Same as Cost
The initial investment alone says little about cost-effectiveness. What matters is the value the warehouse delivers over its service life: reduced labour and space costs, predictable performance, reduced inventory losses, fewer errors, continuous operation and no damage to products or buildings. Over a period of 10 to 15 years, a higher investment in a high-bay warehouse (HBW) can be significantly more cost-effective than a seemingly inexpensive solution that quickly reaches its limits.
How We Determine the Price
We start by analysing your data – item master data, movement data, peak loads, available floor space and building height. Based on this information, we develop a concept and provide a budget price together with a transparent ROI analysis. No glossy presentations, just a reliable figure you can use internally. Only once the overall approach is agreed do we proceed with detailed planning. This helps avoid costly corrections later in the project.
Frequently Asked Questions (FAQ)
We start by analysing your data – item master data, movement data, peak loads, available floor space and building height. Based on this information, we develop a concept and provide a budget price together with a transparent ROI analysis. No glossy presentations, just a reliable figure you can use internally. Only once the overall approach is agreed do we proceed with detailed planning. This helps avoid costly corrections later in the project.
That depends on personnel, space, and process costs. We determine the payback period on a case-by-case basis as part of the ROI analysis; when personnel and space constraints are high, it is often shorter than expected.
The main cost categories are energy, maintenance, and software. During the design phase, we focus on energy-efficient technology to keep operating costs low.
NEXT STEPS?
Request a quote or schedule an initial consultation