System Logistics is building an automated warehouse for Nabaltec AG in Schwandorf, in which two stacker cranes jointly serve a single aisle. This design increases throughput within the aisle.
With the installation of the two cranes, an assembly phase has been completed, making the system visible. The project is being carried out in collaboration with SIBA System Integration GmbH.
The Assembly Step
| Design | Single-mast rack feeders |
| Namber | two |
| Load-handling devices | AKF Q-Line |
| Aisle Length | Approximately 40 meters |
| Special Feature | Both units operate in the same rack aisle |
Installing the units into the completed rack structure is one of the most delicate steps in a system installation. The tolerances are tight, the units are bulky, and the crane operates in a facility where other trades are working simultaneously. Planning and coordination are more critical here than the technology itself.
Why Are There Two Devices in One Alley?
Typically, there is one rack-feeding machine per aisle. It moves to the storage locations, puts items in and takes them out, and its performance limits the throughput of the entire aisle.
If two units are operating in the same aisle, putaway and retrieval can be handled simultaneously. Throughput increases without the need for an additional aisle and, consequently, additional floor space. This requires a material flow control system that coordinates both units and prevents collisions. That is precisely where the complexity of this concept lies.
A Neighborhood Project
Nabaltec AG develops and manufactures specialty chemicals at its Schwandorf facility. The plant is located about 15 kilometers from our site in Wackersdorf.
For a project of this size, a short distance is no minor consideration. On-site coordination, last-minute meetings at the construction site, and the ability to respond quickly to service requests are easier when the trip takes half an hour rather than half a day.
Project Partners
The system is being implemented in collaboration with SIBA System Integration GmbH. We would like to thank everyone involved at Nabaltec AG, SIBA System Integration GmbH, and System Logistics, whose coordination made this installation step possible.
What’s Next
The next steps are the commissioning of the conveyor system, the commissioning of the warehouse management system, and the final acceptance. We will provide updates on the project’s progress here.